The Warner & Swasey Servo ready for production
Viewed: 238 times.
|
Pindrafter(servo)for the NC Textile Technology Center in Belmont North Carolina
Viewed: 208 times.
|
Servo running 100% Scottish and New Zealand wool.
Viewed: 219 times.
|
Servo memory box
Viewed: 233 times.
|
The pin head
Viewed: 228 times.
|
removing the memory box
Viewed: 249 times.
|
Stripping down to the bare frame
Viewed: 254 times.
|
Draft rolls
Viewed: 242 times.
|
Unloading the servos
Viewed: 243 times.
|
Starting to clean the head for removal
Viewed: 158 times.
|
Removing the draft roll pressure unit
Viewed: 155 times.
|
Timing the lower head
Viewed: 138 times.
|
IMG 8725
Viewed: 126 times.
|
IMG 8726
Viewed: 114 times.
|
Ready for installation on the frame
Viewed: 113 times.
|
Mounted on the frame
Viewed: 119 times.
|
A clean memory box,PIV and pump
Viewed: 114 times.
|
Memory box calibrated
Viewed: 124 times.
|
|
Sandblasted frame ready for priming
Viewed: 120 times.
|
Pin ready to load with fallers
Viewed: 108 times.
|
Putting the covers on
Viewed: 111 times.
|
Our first run with the large measuring rolls
Viewed: 117 times.
|
Rebuilding the coiler
Viewed: 109 times.
|
Linking the servo with the coiler
Viewed: 115 times.
|